








| Setting frames up on the strongback |
| Set the transom in place with jigs to hold the angle. battens are lying on frames for set in. |
| Fit battens and chines in notches and dry fit. Be sure to allow for water flow between stations. |
| Chines are cut into stem post so that curve flows naturally from sides to stem. |
| Battens are fit to the side of the chine toward the bow of the boat. |
| Rear view of all chines and battens in place. At this point the boat hull frame should be solid and ready for planking. |
| At this point side planking should go on easily. Note how it simply bends into place on the stem. |
| Bottom planking in place here. Ready to attach side planking. |
| Side planking in now. Planking will easily make turns. Final layer of wood on transom and ready to be sanded down. |