-1-Introduction to the Kayak Building Series.
-2-Cutting Kayak Forms From Patterns
-3-Epoxy Primer
-4-Making the Stems
-5-Building the Strongback
-6-Mounting the Forms
-7-The Sheer Clamp
-8-Aligning the Forms
-9-The First Strips
-10-Stripped Half Way
-11-Stapleless Construction
-12-Making the Bulkheads
-13-Finishing Up the first side
-14-Cutting the Centerline and Meeting the Strips
-15-Prepping the Bottom
-16-Glassing the Bottom
-17-Bottom Second Glass Layer
-18-Filler Coats
-19-Flipping the Hull
-20-Stripping the Deck
-21-Popping the Deck
-22-Prepping the Inside Hull
-23-Glassing the Inside of the Kayak
-24-Attaching the Sheer Clamp
-25-Deck Support Knees
-26-Installing Foot Braces
-27-Preparing for the Kayak Deck Install
-28-Kayak Deck Install
-29-Building the Coaming
-30-Large Tandem Cockpits
-31-Cutting The Hatch
-32-Kayak Urethane Finish
-33-Kayak Wrap Up
Sandy Point Boat WorksPO Box 687Carver MA 02330
CLICK HERE TO EMAIL US!
508-878-8057